E61 Group Head Flow Control for Manual Profiling
Bring manual flow profiling home! With theE61 group head flow control device by Quick Mill you can manually profile your extractions by adjusting the flow from the closed position (0-bar) to full pump pressure, usually 9-bar. This E61 flow control device can work on many common machines.
Installing the Flow Control
The Quick Mill flow control kit provides you with all of the necessary pieces you’ll need to install it to your existing E61 group. It installs on the front of the group with just a couple of tools required:
- Teflon Tape
- Electrical Tape
- 5mm Allen Key
- 12” Adjustable Socket Wrench
Compatible with the Following Machines
Izzo: Duetto, Duetto Evo, Vivi PID
Quick Mill: Alexia, Carola, Anita, Andreja Premium, QM67, Vetrano 2B
Rocket: Appartamento, R58 Cinquantotto, Mozzafiato (both models), Giotto (both models)
Should work on the following with E61 Groupheads:
Isomac
Expobar
ECM
*Please note that we are not responsible for any damage before, during, or after installation. Damages can include, but not limited to:
- Over-tightening the gauge into the group head (causing the gauge thread to break and threading broken inside the group head). Replacement Linked here.
- Breaking of gaskets and o-rings,
- Scratches on mushroom,
- Over-tightening of gicleur, and/or
- Limescale build up.